Pages

Friday, 16 September 2011

Unit 22.2 Risk Assessment

Production Company: Those Awesome Films
Production Phone Number: 01283 494400

I have been through this Risk Assessment Form, and have identified these risks;

Location: Friends Flat in Ashby
Date: 16/09/11
Risks
24 Live Electrical Equitment
Low Risk; Wires connecting to laptops, electric drum kit, microphone etc.
Controls to minimize risk: Make all people in the flat aware of where these wires occur. Make sure the wires are out of the way so people can't trip on them unexpectedly.
People at risk informed? Yes.


Location: High Street Ashby
Date: 16/09/11
Risks
24 Live Electrical Equitment
Medium Risk; Electrical Wires Connecting to Rides, Generators etc.
Controls to minimize risk: Make all people present aware of these risks. I will film away from the electrical places to reduce risk.
People at risk informed? Yes.


25 Machinery Proximity
Medium Risk: Fair Ground Rides
Controls to minimize risk: I shall warn the people at risk to obey the warning signs and to not do anything that could be concidered reckless.
People at risk informed? Yes.

28 Noise/ High Sound levels
Medium Risk: Loud Fair Ground Music
Controls to minimize risk: Time spent there will be kept to a minimum to reduce risk of causing damage to ears.

People at risk informed? Yes.

Location: Grandparents House
Date: 18/09/11
Risks
24 Live Electrical Equitment
Low Risk; Wires connecting to laptop, hard drive etc.
Controls to minimize risk: Make all people in the house aware of where these wires occur. Make sure the wires are out of the way so people can't trip on them unexpectedly.
People at risk informed? Yes.


No comments:

Post a Comment